Texas Tech University

Updates and Renovations

Fiscal Year 2017 - 2018 Projects

Chitwood

  • Renovated custodial closets
  • Installed new vanities
  • Removed Accordion Closet Doors
  • Added new student flooring
  • Added USB Receptacles
  • Replaced Desk Lights with New LED Desk Lights
  • Added New Bolsters and Bulletin Boards
  • Refinished all woodwork
  • Repainted Surfaces
  • Repainted Hallways
  • Painted Doors and Door Frames
  • Replaced all corridor carpet

Bledsoe

  • Renovated 4 resident restrooms and 1 guest restroom

Talkington

  • Repainted 3rd floor

Weymouth

  • Replaced all three elevator machines

Murray/Carpenter/Wells

  • Upgraded fire panel including graphic interface

Coleman

  • Renovated kitchenettes into permanent student rooms

Fiscal Year 2016 - 2017 Projects

Weymouth

  • Replaced Windows
  • Installed New Vanities
  • Removed Accordion Closet Doors
  • Added New Student Flooring and Basement Flooring
  • Added USB Receptacles
  • Replaced Desk Lights with New LED Desk Lights
  • Added New Bolsters and Bulletin Boards
  • Fixed Scratches and Marks in Furniture (Millwork)
  • Repainted Surfaces
  • Repainted Hallways
  • Painted Doors and Door Frames
  • Replaced Carpet on the 7th Floor

Hulen/Clement

  • Replaced Fire Alarm System

Murray

  • Completed Office Extension and Remodel
  • Completed Stone Work Around Horse Sculpture
  • Replaced Student Room Carpet with Luxury Vinyl Tile

Horn

  • Remodeled 6 Community Style Bathrooms

Talkington

  • Repainted the 4th Floor

Coleman

  • Repainted Corridors

Fiscal Year 2015 - 2016 Projects

Wall/Gates - Student Rooms

  • Replaced all windows
  • Refinished all millwork (sanded, stained and sealed)
  • Repainted all walls
  • Added USB outlets
  • New Sinks
  • New vanity cabinets
  • New lighting
  • New window blinds
  • Removed closet doors
  • Reupholster all bolsters
  • Installed bulletin boards in all rooms in Gates (Wall already had them)
  • Renovated the private restrooms in the accessible student rooms

Wall/Gates - Common Areas

  • Renovated all community and guest restrooms
  • Renovated 2 community kitchens
  • Upgraded plumbing for restrooms and student rooms
  • Painted corridors, trim and doors
  • Renovated hall office
  • New furniture in lobby
  • Reupholstered existing furniture to match new furniture
  • New custom wall vinyl in lobby
  • New rugs in lobby

Wall/Gates - Other

  • Renovated all 4 staff apartments. Two were completely remodeled and 2 were minor updates.

Bledsoe

  • Reupholstered sofas in study and recreational/TV lounges

Talkington

  • Installed new glass-boards in study lounges

Chitwood

  • Upgraded wi-fi

Stangel/Murdough

  • Installed new furniture in 2nd floor lounges
  • Upgraded wi-fi
  • Bird deterrent

Sneed

  • Removed all "triple" furniture from 2nd and 3rd floor
  • Replaced all lobby furniture
  • Painted walls and columns
  • New bulletin boards
  • Installed glassboards
  • New television
  • New custom area rugs in lobby
  • New flooring in hall office, RLC office and conference room
  • Upgraded lighting in lobby

Horn/Knapp

  • Removed all "triple" furniture from 2nd and 3rd floor
  • Converted all triple rooms in 1st floor Horn/Knapp to have 3 loft beds (as opposed to Bledsoe/Sneed triples that have 1 loft and a set of bunk-beds)
  • Replaced carpet in one lounge/lobby
  • Added furniture to 4 of the 1st floor lobbies/lounges

Housing Services

  • Renovated 2 offices
  • Replaced carpet in 2 additional offices

Gordon

  • Renovated outdoor atrium area
  • New "media center" in study lounge

Murray & Carpenter/Wells

  • Converted study lounges into office in the Learning Development Center (LDC), rooms 101, 102, and 103 (Repainted rooms, and ordered new furniture).
  • Upgraded wi-fi
  • Bird deterrent

Fiscal Year 2014 - 2015 Projects

Carpenter/Wells

  • Fire Suppression System Upgrade

Chitwood

  • Upgrade Study Lounge Furniture
  • Remodel Study Lounge

Clement

  • Updated elevator lobbies
  • Remodel trash rooms
  • New lobby rugs

Coleman

  • Study Lounge Remodel

Gates

  • Bulletin Boards Installed in All Rooms

Hulen

  • Updated elevator lobbies
  • Remodel trash rooms
  • New lobby rugs

Stangel/Murdough

  • Bath/Show Renovations
  • Window Replacement
  • New Flooring
  • New Blinds
  • Paint Corridors, Doors and Frames
  • Updated Plumbing Fixtures and Accessories
  • Renovate Staff and ADA Apartments

Knapp

  • Study Lounge Renovations

Murray

  • New Mattresses


Stangel Bathroom Renovation