| If approved, the
new leisure pool will be constructed on the South side
of the Student Recreation Center and be available for
use in 2008. |


|
Potential components and water features include:
- Lazy River
- Heated Water
- In-Water Bubble Benches
- Large Hot Tub
- Chute/Slide
- Water Spray Areas
- Lap Lanes
- Waterfall
- Adjoining Group Meeting Area
- Poolside Cafe
|
| Also included in this proposed project is construction
of a permanent hard roof over the existing Aquatic Center.
This would allow for 12 months of indoor use. |
| To accomplish this, the Rec Fee would increase by $9/semester
from $60 currently to $69, but would NOT be assessed or
increased until the pool is completed and open to students
- sometime in the year 2008. |
| The photos on this page are from other Texas Universities
to give you an idea of what may be included. You can also
check out the University
of Texas Leisure Pool |
| Please assist
us in the planning by listing what components you would
like to see included in the proposed leisure pool or just
tell us your thoughts! |