Midland SL250 Safety Study Project (2017)

Texas Department of Transportation (TxDOT) Odessa District contracted the Texas Tech University Center for Multidisciplinary Research in Transportation (TechMRT) and Trans Tech Lab (TTL) to analyze the crashes along the SL250 corridor in Midland, Texas.
The project includes: pdf logo

  • Systematically identify the causes of crashes along the SL250 and provide recommendations.
  • Develop prototype methodologies and visualized GIS data management tool for larger scale studies.
  • Quick crash report application.

midland map

Abilene District Traffic Signal Timing and Capacity Analysis (2017)

Texas Department of Transportation (TxDOT) Abilene District contracted the Texas Tech University Center for Multidisciplinary Research in Transportation (TechMRT) and Trans Tech Lab (TTL) to optimize the signal coordination, detection systems and equipment to effectively handle traffic. The overarching goal of this project is to improve the traffic operations of multiple arterial roads in the City of Abilene and bring the traffic signals into an up-to-date standard. pdf logo

abilene map

Midland SL250 Corridor Study Project (2014)

Texas Department of Transportation (TxDOT) Odessa District contracted the Texas Tech University Center for Multidisciplinary Research in Transportation (TechMRT) and Trans Tech Lab (TTL) to investigate the current LOS values of the main-lanes, frontage roads, ramps, and intersections along SL250, and develop potential solutions to alleviate these traffic concerns. pdf logo

midland map

Lubbock Comparative Analysis of Design Alternatives for Marsha Sharp Freeway and State Loop 289 (2014)

Texas Department of Transportation (TxDOT) Lubbock District contracted the Texas Tech University Center for Multidisciplinary Research in Transportation (TechMRT) and Trans Tech Lab (TTL) to analyze the efficacy of two different design alternatives for improving the operational conditions of a segment of westbound Marsha Sharp Fwy.  pdf logo

lubbock map

Amarillo District Modeling Proposed Changes along IH40 and LP335 (2013)

Amarillo Metropolitan Planning Organization (MPO) Policy Board has allocated $6.4 million in 2014 and 2015 to a project along IH-40 from Coulter Street to Helium Road and along Loop 335 from SW 45th Avenue to Amarillo Boulevard (BI-40) to improve capacity, mobility and safety. The existing segment along LP 335 has developed with the expansion of large commercial retail outlets in the area, which has caused the corridor to become congested, especially during peak shopping periods. The project includes:  pdf logo

  • Evaluate projected traffic based upon future development.
  • Model and determine existing LOS and travel times for IH-40 main lanes, frontage roads and intersections and LP 335 from 45th Ave. to Amarillo Blvd. for current and projected traffic.
  • Model and evaluate three proposed conditions for current and projected traffic.
  • Develop signal timing plans to maximize LOS for the segment of LP 335 from 45th Ave. to Amarillo Blvd. and at the IH 40 intersections of LP 335 and Coulter Rd.

amarillo map

Restricted Truck Lane Feasibility Study (2013)

Texas Department of Transportation (TxDOT) contracted the Texas Tech University Center for Multidisciplinary Research in Transportation (TechMRT) and Trans Tech Lab (TTL) to conduct a feasibility and capacity analysis of highway segments in the Lubbock, Amarillo, and El Paso Districts to evaluate the feasibility of restricted truck lanes. The ultimate goal of this project was to recommend to TxDOT whether the four locations identified for the study should be subject to truck lane restrictions as well as to indicate what the potential costs in opertional performance restricting lanes to trucks in these locations may be.  pdf logo

truck lane map

US62/82 (Phase 5B) Capacity Analysis (2013)

Texas Department of Transportation (TxDOT) Lubbock District contracted the Texas Tech University Center for Multidisciplinary Research in Transportation (TechMRT) and Trans Tech Lab (TTL) to perform a corridor study for a segement US 62/82 in Lubbock. To provide better accessibility for the residents near 66th street, TxDOT proposed two alternatives of the ramp configuration. TTL conducted a simulation based capacity analysis along this section with the aim to identify whether these two alternative layouts would cause potential congestion on both main-lane and frontage roads.  pdf logo

lubbock map

User's Cost Analysis at US87 and Woodrow Rd. (2013)

Texas Department of Transportation (TxDOT) contracted the Texas Tech University Center for Multidisciplinary Research in Transportation (TechMRT) and Trans Tech Lab (TTL) to do a delay-based calculation of road user's cost for an underpass at US87 and Woodrow road.  pdf logo

aerial map

Lubbock State Loop 289 Corridor Study Phase II (2012)

South Loop 289 stretching from the I-27 interchange to Spur 327 is one of the busiest corridors in Lubbock. It traverses the key business center of the city and includes four major interchanges connecting with local arterial streets. This large traffic volume creates increased peak-hour congestion, traffic weaving, and safety concerns. Continue to explore the solutions from Phase I.  pdf logo

lubbock map

Lubbock Signal Timing and Capacity Analysis at North Loop 289 (2011)

Texas Department of Transportation (TxDOT) Lubbock District contracted the Texas Tech University Center for Multidisciplinary Research in Transportation (TechMRT) and Trans Tech Lab (TTL) to design signal timing plans and perform capacity analyses of three proposed layout options for Erskine Street and Quaker Avenue at North Loop 289 in Lubbock, Texas.  pdf logo

lubbock map

Plainview District Freeway Weaving and Ramp Junction Analysis along IH27 (2011)

This project models the traffic flow and conducts weaving and ramp junction analysis along the main lanes of I‐27 between FM 3466 to SH 194. The interchange of IH‐27 and U.S. Hwy 70 was also simulated to analyze the effect of the proposed one‐way frontage road and interchange configuration compared to existing ones with three groups of traffic volumes: existing, projected 2015, and projected 2035.  pdf logo

plainview map

Plainview District Congestion Mitigation at IH27 and US Hwy 70 (2010)

Texas Department of Transportation (TxDOT) contracted the Texas Tech University Center for Multidisciplinary Research in Transportation (TechMRT) and Trans Tech Lab (TTL) to analyze four solutions to congestion at IH27 and US Highway 70 from a traffic engineering perspective and evaluate the relative merits of each, thus finding the most appropriate countermeasures for congestion along the IH27 frontage roads.  pdf logo

plainview map

Lubbock State Loop 289 Corridor Study Phase I (2008)

Texas Department of Transportation (TxDOT) Lubbock District contracted the Texas Tech University Center for Multidisciplinary Research in Transportation (TechMRT) and Trans Tech Lab (TTL) to do thorough evaluation of the level of service of a 6-mile section of its highway loop system that encircles the City of Lubbock. It also requires identification of the best solutions from a set of improvement alternatives for both current and future traffic conditions. pdf logo

lubbock map

TransTech Lab

  • Address

    Department of Civil & Environmental Engineering, Texas Tech University, 2500 Broadway, Lubbock, TX 79409
  • Email

    hongchao.liu@ttu.edu