Updates and Renovations
Fiscal Year 2017 - 2018 Projects
Chitwood
- Renovated custodial closets
- Installed new vanities
- Removed Accordion Closet Doors
- Added new student flooring
- Added USB Receptacles
- Replaced Desk Lights with New LED Desk Lights
- Added New Bolsters and Bulletin Boards
- Refinished all woodwork
- Repainted Surfaces
- Repainted Hallways
- Painted Doors and Door Frames
- Replaced all corridor carpet
Bledsoe
- Renovated 4 resident restrooms and 1 guest restroom
Talkington
- Repainted 3rd floor
Weymouth
- Replaced all three elevator machines
Murray/Carpenter/Wells
- Upgraded fire panel including graphic interface
Coleman
- Renovated kitchenettes into permanent student rooms
Fiscal Year 2016 - 2017 Projects
Weymouth
- Replaced Windows
- Installed New Vanities
- Removed Accordion Closet Doors
- Added New Student Flooring and Basement Flooring
- Added USB Receptacles
- Replaced Desk Lights with New LED Desk Lights
- Added New Bolsters and Bulletin Boards
- Fixed Scratches and Marks in Furniture (Millwork)
- Repainted Surfaces
- Repainted Hallways
- Painted Doors and Door Frames
- Replaced Carpet on the 7th Floor
Hulen/Clement
- Replaced Fire Alarm System
Murray
- Completed Office Extension and Remodel
- Completed Stone Work Around Horse Sculpture
- Replaced Student Room Carpet with Luxury Vinyl Tile
Horn
- Remodeled 6 Community Style Bathrooms
Talkington
- Repainted the 4th Floor
Coleman
- Repainted Corridors
Fiscal Year 2015 - 2016 Projects
Wall/Gates - Student Rooms
- Replaced all windows
- Refinished all millwork (sanded, stained and sealed)
- Repainted all walls
- Added USB outlets
- New Sinks
- New vanity cabinets
- New lighting
- New window blinds
- Removed closet doors
- Reupholster all bolsters
- Installed bulletin boards in all rooms in Gates (Wall already had them)
- Renovated the private restrooms in the accessible student rooms
Wall/Gates - Common Areas
- Renovated all community and guest restrooms
- Renovated 2 community kitchens
- Upgraded plumbing for restrooms and student rooms
- Painted corridors, trim and doors
- Renovated hall office
- New furniture in lobby
- Reupholstered existing furniture to match new furniture
- New custom wall vinyl in lobby
- New rugs in lobby
Wall/Gates - Other
- Renovated all 4 staff apartments. Two were completely remodeled and 2 were minor updates.
Bledsoe
- Reupholstered sofas in study and recreational/TV lounges
Talkington
- Installed new glass-boards in study lounges
Chitwood
- Upgraded wi-fi
Stangel/Murdough
- Installed new furniture in 2nd floor lounges
- Upgraded wi-fi
- Bird deterrent
Sneed
- Removed all "triple" furniture from 2nd and 3rd floor
- Replaced all lobby furniture
- Painted walls and columns
- New bulletin boards
- Installed glassboards
- New television
- New custom area rugs in lobby
- New flooring in hall office, RLC office and conference room
- Upgraded lighting in lobby
Horn/Knapp
- Removed all "triple" furniture from 2nd and 3rd floor
- Converted all triple rooms in 1st floor Horn/Knapp to have 3 loft beds (as opposed to Bledsoe/Sneed triples that have 1 loft and a set of bunk-beds)
- Replaced carpet in one lounge/lobby
- Added furniture to 4 of the 1st floor lobbies/lounges
Housing Services
- Renovated 2 offices
- Replaced carpet in 2 additional offices
Gordon
- Renovated outdoor atrium area
- New "media center" in study lounge
Murray & Carpenter/Wells
- Converted study lounges into office in the Learning Development Center (LDC), rooms 101, 102, and 103 (Repainted rooms, and ordered new furniture).
- Upgraded wi-fi
- Bird deterrent
Fiscal Year 2014 - 2015 Projects
Carpenter/Wells
- Fire Suppression System Upgrade
Chitwood
- Upgrade Study Lounge Furniture
- Remodel Study Lounge
Clement
- Updated elevator lobbies
- Remodel trash rooms
- New lobby rugs
Coleman
- Study Lounge Remodel
Gates
- Bulletin Boards Installed in All Rooms
Hulen
- Updated elevator lobbies
- Remodel trash rooms
- New lobby rugs
Stangel/Murdough
- Bath/Show Renovations
- Window Replacement
- New Flooring
- New Blinds
- Paint Corridors, Doors and Frames
- Updated Plumbing Fixtures and Accessories
- Renovate Staff and ADA Apartments
Knapp
- Study Lounge Renovations
Murray
- New Mattresses
Fiscal Year 2018 - 2019 Projects
Chitwood
- HVAC Duct work cleaning
- Lobby renovation
- Replace windows
- CCTV on all floors
Bledsoe
- Fire alarm panel replacement
- Painted corridors, doors, and facings
Stangel
- Added Bird deterrent
Talkington
- Painted all student rooms on 2nd floor
Weymouth
- CCTV on all floors
Hulen-Clement/Wall-Gates
- Air Handler Cleaning
Sneed
- Painted all student rooms
- Installed USB outlets in all student rooms
- Install vanities in all student rooms
- Install vanity tops and related plumbing
- Renovated 1 supply room closet and First floor trash room
- Replace flooring in 1st and 2nd floor student rooms
- Replace corridor carpet on all floors
- Replace sink drain and vent lines
Coleman
- Renovated all 3 elevators
- CCTV on all floors