OP 72.01: Equipment Purchases Requiring Building and/or Building System Modification
[Moderate revision–posted 6/24/26 (replaces 9/5/23 edition)]

Operating Policy and Procedure
OP 72.01: Equipment Purchases Requiring Building and/or Building System Modification
DATE: June 24, 2026
PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to outline the procedures and coordination to be followed before the purchase of equipment that will require special building and/or building system modifications and/or additions prior to installation.
REVIEW: This OP will be reviewed every two years after publication by the Assistant Vice President and Chief Procurement Officer and the Associate Vice President for Operations with substantive revisions forwarded to the Senior Vice President for Administration & Finance and Chief Financial Officer.
POLICY/PROCEDURE
Definition
Procurement (Procure) – Purchasing, renting, leasing, or otherwise acquiring any goods and services, including all functions that pertain to the acquisition through contract close-out.
General
1. This OP shall apply to the procurement of equipment from all sources of funds that will require any modification of the building or building systems in which the equipment is to be installed, located, or moved through. The special requirements of the equipment to be installed include, but are not limited to:
a. Special electrical circuits other than the normal 120 V plug-in;
b. Minimum and maximum conditioning of room temperatures;
c. Ventilation changes to the room;
d. Non-portable equipment requiring installation;
e. Voltage regulation or power conditioning;
f. Water connections for internal cooling;
g. Any modification or equipment that will significantly alter the KW load or electrical demand profile of the building; and
h. Charges associated with delivery or handling of equipment.
2. All equipment requests or purchase requisitions that will require special building modification requirements prior to installation must be reviewed and coordinated with Operations prior to the approval of the contract and/or purchase order.
3. Procedures
a. A requisition must be submitted in TechBuy with a quote and sufficient details describing any installation or operational requirements. Procurement Services will coordinate with Operations to obtain approval for any building modifications required. The requisition for the procurement of the equipment must comply with OP 72.09, Procurement of Goods and Services.
b. A Customer Project Request (CR) must be submitted along with the requisition in accordance with OP 61.28, Construction Projects Costing Less than $4 Million and Renovation Projects Costing Less than $4 Million, to request a project for the building modifications. Online requests can be made using iServiceDesk. Please contact Operations Service Center at 806.742.4OPS (4677) for assistance.
c. Based on the scope of work required, Operations will assign a project manager to perform the necessary engineering evaluation and design and provide a cost estimate. The estimate will be returned to the requisitioning department using a Funding Request form (see attachment). The estimate must be reviewed and the funding source(s) for the work identified prior to ordering equipment. After identification of the funding source(s) and account manager approval (if required), the Funding Request form will be returned to Operations. This will begin the material requisitioning for the support requirements.
OP Categories
- 01 Chancellor
- 02 Development
- 04 Audit Services
- 10 President
- 30 Academic and Student Affairs – General
- 32 Academic Policies – Faculty
- 34 Academic Policies – Students
- 36 Academic Programs
- 40 Institutional Compliance
- 48 Communication Services
- 52 Information Technology
- 60 Environmental Health and Safety
- 61 Facilities Management
- 62 Financial and Accounting
- 63 General Services
- 64 Graduate Programs (Faculty and Students)
- 65 Research Accounting
- 66 Libraries
- 67 Mail Services
- 68 Communications and Marketing
- 69 Payroll and Tax Services
- 70 Human Resources
- 72 Purchasing, Contracting, and Payables
- 73 Data Management
- 74 Research
- 75 Research Security
- 76 Security
- 77 Student Services and Registrar
- 78 Traffic and Parking
- 79 Travel
- 80 Vehicles
Operating Policies & Procedures
-
Address
Texas Tech Downtown Center Room 218 -
Email
officialpublications@ttu.edu