PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to outline the procedures and coordination to be followed before the purchase of equipment that will require special building and/or building system modifications and/or additions prior to installation.
REVIEW: This OP will be reviewed in June of odd-numbered years by the Chief Procurement Officer and the Associate Vice President for Operations with substantive revisions forwarded to the Senior Vice President for Administration & Finance and Chief Financial Officer.
POLICY/PROCEDURE
Definition
Procurement (Procure): Purchasing, renting, leasing, or otherwise acquiring any goods and services, including all functions that pertain to the acquisition through contract close-out.
General
1. This OP shall apply to the procurement of equipment from all sources of funds that will require any modification of the building or building systems in which the equipment is to be installed, located, or moved through. The special requirements of the equipment to be installed include, but are not limited to:
a. Special electrical circuits other than the normal 120 V plug-in;
b. Minimum and maximum conditioning of room temperatures;
c. Ventilation changes to the room;
d. Non-portable equipment requiring installation;
e. Voltage regulation or power conditioning;
f. Water connections for internal cooling;
g. Any modification or equipment that will significantly alter the KW load or electrical demand profile of the building; and
h. Charges associated with delivery or handling of equipment.
2. All equipment requests or purchase requisitions that will require special building modification requirements prior to installation must be reviewed and coordinated with Facilities Maintenance and Construction (FMC, formerly BMC) prior to the approval of the purchase order.
3. Procedures
a. A requisition must be submitted in TechBuy with a quote and sufficient details describing any installation or operational requirements. Procurement Services will coordinate with FMC to obtain approval from that department for any building modifications required. The requisition for the procurement of the equipment must comply with OP 72.09, Procurement of Goods and Services.
b. A Project Request must be submitted along with the requisition in accordance with OP 61.28, Construction Projects Costing Less than $4 Million and Renovation Projects Costing Less than $4 Million to obtain a cost estimate for the building modifications. Online requests can be made using the iServiceDesk. Please contact FMC Work Control at 806.742.4677 for assistance.
c. FMC, in coordination with Operations Division Planning and Design (ODPD), will perform the necessary engineering evaluation and design and provide a cost estimate. The estimate will be returned to the requisitioning department using the CR Approval/Disapproval form (see attachments). The estimate must be reviewed and the funding source(s) for the work identified prior to ordering equipment. After identification of the funding source(s) and account manager approval (if required), the CR Approval/Disapproval form will be returned to FMC. This will begin the material requisitioning for the support requirements.
Attachment A: Customer Project Request (CR) Approval/Disapproval Example (Projects ≧ $25,000)
Attachment C: Customer Project Request (CR) Approval/Disapproval Example (Projects < $5,000)
OP Categories
01 Chancellor
02 Development
04 Audit Services
10 President
30 Academic and Student Affairs – General
32 Academic Policies – Faculty
34 Academic Policies – Students
36 Academic Programs
40 Equal Opportunity and Affirmative Action
48 Communication Services
52 Information Technology
60 Environmental Health and Safety
61 Facilities Management
62 Financial and Accounting
63 General Services
64 Graduate Programs (Faculty and Students)
65 Research Accounting
66 Libraries
67 Mail Services
68 Communications and Marketing
69 Payroll and Tax Services
70 Human Resources
72 Purchasing, Contracting, and Payables
74 Research
76 Security
77 Student Services and Registrar
78 Traffic and Parking
79 Travel
80 Vehicles
Operating Policies & Procedures
-
Address
Texas Tech Downtown Center Room 218 -
Email
officialpublications@ttu.edu