Budgeting Subcontracts
For budgeting purposes, the subcontract (or subgrant) should be identified in the proposal budget as a separate line item. The item should be noted and a cost breakdown for the subcontract should be referenced as an attachment to the main proposal budget. The subcontract budget should reflect all appropriate direct and indirect (F&A - Facilities and Administrative Costs) costs. (Educational institutions should include F&A costs at their current federally negotiated rates.) Subcontract budgets must be approved by appropriate officials of the proposed subcontractors preferably before the proposal is submitted.
- The first $25,000 of EACH subcontract in your proposed budget will be included in the Modified Total Direct Cost (MTDC) base used for calculating F&A cost.
- TTU will not limit the F&A recovery by the subcontractor unless required to do so by the agency (which most will not do).
Office of Research Services
-
Address
Texas Tech University, 2625 Memorial Circle, Lubbock, TX 79409 -
Phone
806.742.3884 -
Email
ors@ttu.edu