In accordance with Article VII, Section 17(a) of the Texas Constitution, Higher Education Funds (HEF) are appropriated for the following purposes:
- Acquisition of land either with or without permanent improvements
- Constructing and equipping of buildings or other permanent improvements
- Major repairs or rehabilitation of buildings or other permanent improvements
- Acquisition of capital library books, software, and reference materials
- Acquisition of capital equipment - defined as items that a) are for use in current or future operations and not for the purpose of resale, b) are relatively long-lived, c) have physical substance, and d) provide measurable future benefit to the university. Capital equipment in this context does not have to be $5,000+.
- Acquisition of cloud computing services (software as a service) with a contract or obligation period of more than one year, within the guidelines set forth in this document. Procurement Services and Accounting Services will assess the allowability of arrangement exceptions not directly outlined within this document.
Note: HEAF funds range from 13A-13B. The funds 13A are for the purchase of equipment/furnishings. Fund 13B is the only fund in the HEAF fund range that is used for construction and/or major repairs.
- HEAF funds cannot be used for lease/purchases, rentals, or subscriptions.
- HEAF funds can only be used for education and general (E&G) purposes - not auxiliary enterprises or intercollegiate athletics.
HEAF BOND PROCEDURES
- University procurement procedures are used for expenditures using HEAF bond proceeds.
- HEAF bond proceeds may be used to purchase:
- Land with or without permanent improvements
- Constructing and equipping buildings or other permanent improvements
- Major repair and rehabilitation of buildings or other permanent improvements
- HEAF bond proceeds (91 A's- 91 B's - not HEAF funds) may not be used to purchase capital equipment for an existing E&G building, but may only be used to purchase equipment in connection with constructing a building or other permanent improvement.
- HEAF bond proceeds can only be used for education, general buildings, and facilities, not auxiliary enterprises.
ACCEPTABLE HEAF EXPENDITURES AND RESTRICTIONS
- Acquisition of land with or without permanent improvements: For the purposes of HEAF
expenditures, the following definitions and guidelines apply:
- Land: The surface or crust of the earth, which can be used to support structures and which may be used to grow crops, grass, shrubs, and trees.
- Cost of land may include:
- Purchase price
- Commissions
- Fees for examining and recording titles
- Surveying
- Drainage cost
- Land clearing
- Demolition of existing improvements (less salvage)
- Landfilling
- Grading
- Interest on mortgages accrued at the date of purchase
- Other cost incurred in acquiring the land
- Construction and equipping of buildings or other permanent improvements, for the purposes
of these guidelines, are defined as follows:
- Constructing and equipping: The process of erecting buildings and providing equipment that will assure that the buildings can be used for the purposes intended, and the constructing and equipping of other permanent improvements. This category includes additions to and equipping of existing buildings. It does not include consumable supplies.
- Buildings: Roofed structures (conventional or underground) housing operations. This category includes storage structures and additions to buildings meeting this definition.
- Other permanent improvements: Assets that enhance the quality of land or buildings or facilitate the use of land
or buildings and that have finite but extended lives. Permanency is relative and should
be interpreted in terms of the periods of usefulness. Only
- Examples of other permanent improvements: Paving, lighting, fences; sewers; electrical distribution systems; water systems; sewer systems; landscaping; air conditioning; elevators; vent hoods; energy management systems; mechanical, plumbing, and electrical systems; voice-and-data systems; computing systems; and the like.
- Systems that in normal usage could be moved from building to building or from room to room are not included as permanent improvements.
- Cost of buildings may include:
- Original contract price or cost of construction;
- Expenses for remodeling, reconditioning, or altering a purchased building to make it suitable for the
- purpose for which it was acquired;
- Payment of unpaid or accrued taxes on the building to the date of purchase;
- Cancellation or buy-out of existing leases;
- Other cost related to placing the asset into operation
- Construction costs of buildings and other permanent improvements can include the costs
of:
- The completed project;
- Excavation, grading, or filing of land for specific building;
- Preparation of plans, specifications, blueprints, etc.;
- Building permits;
- Architects', engineers', or management fees for design and supervision;
- Legal fees;
- Temporary buildings used during construction;
- Unanticipated costs such as rock blasting, piling, or relocation of channel of underground stream;
- Drainage cost;
- Land clearing;
- Demolition of existing improvements;
- Maintenance agreements purchased as part of the original acquisition (such as those software application programs and operating systems or for energy management systems).
- Equipping costs can include costs of:
- Original contract or invoice of the furnishings or equipment;
- Freight-in, import duties, handling, and storage;
- Specific in-transit insurance;
- Sales, use, or other taxes imposed on the acquisition;
- Site preparation;
- Testing and preparing for use;
- Reconditioning used items when purchased;
- Maintenance agreements purchased as part of the original acquisition;
- Development of software application programs and operating systems.
- Unless approved in advance by the Legislature, institutions cannot use these funds for constructing and equipping buildings and other improvements for a branch campus or educational center that is not a separate degree-granting institution created by general law.
- Major repairs or rehabilitation of buildings or other improvements can include the
following categories:
- Repairs
- Renovations
- Replacements
- Improvements
- These improvements are normally expected to:
- Extend the useful life in excess of one year
- Improve operating efficiency
- Eliminate health and safety hazards
- Correct structural or mechanical defects
- Upgrade the quality of existing facilities
- Convert these assets to more useful functions
- HEAF funds may be used to purchase hardware and building supplies for use on "major" construction or renovation projects. This does not include projects for routine maintenance, repairs, cleaning, painting, and replacement of a part or component with a comparable part, minimal increase in life expectancy of an existing building. Qualifying HEAF projects must have a total cost exceeding $5,000, the State's established floor for capital assets.
- Acquisition of capital equipment, library books, and library materials, for the purposes
of HEAF expenditures, include the following definitions and guidelines:
- Capital equipment: Fixed or movable tangible assets to be used for operations, the benefits of which extend over more than one fiscal year. These assets may be purchased from an outside vendor or constructed or developed by university employees. Computer software operating systems and application programs are considered capital equipment under this definition; routine maintenance is not an allowable HEAF expenditure.
- Equipment costs can include costs of:
- Original contract or invoice of the furnishings or equipment
- Freight-in, import duties, handling, and storage
- Specific in-transit insurance
- Sales, use, and other taxes imposed on the acquisition
- Site preparation
- Installation
- Testing and preparation for use
- Reconditioning used items when purchased
- Maintenance agreements purchased as part of the original acquisition
- Development costs of computer software
- Equipment parts may be purchased with HEAF funds if the parts materially extend or increase the useful life of an existing piece of equipment. HEAF may also be used for the purchase of parts or accessories for incorporation into a newly purchased piece of equipment. In these cases, the purchase order description must clearly identify the purchase's HEAF allowable purchase category, and refer to parent equipment by indicating the university's property inventory number, the equipment serial number, and the parent equipment's original purchase order number.
- Library: For the purposes of these guidelines, a collection of books and materials in locations approved by the university that is accessible to the general university community
- Library book: A literary composition bound into a separate volume, generally identifiable as a separately copyrighted unit. Books should be distinguished from periodicals and journals.
- Library materials: Information sources other than books (either owned or accessed), which provide information
essential to the learning process, or which enhance the quality of university library
programs, including:
- Journals
- Periodicals
- Microforms
- Audiovisual media
- Computer-based information
- Manuscripts
- Maps
- Documents
- Cost of library books and library materials can include the costs of:
- Invoice price of books or library materials
- Freight-in, handling, and insurance
- Binding
- Electronic access
- Reproduction and like cost
- Similar costs required to put these assets in place, excluding library salaries
- Acquisition of cloud computing services (software as a service) or other intangible
software include the following definitions and guidelines:
- Contract or purchasing agreement must be for more than one year. Expenses for subsequent renewal periods that are included within contract or purchasing agreement terms and conditions are allowable pending the original contract or purchasing agreement term was for more than one year.
- The length of a contract term for individual orders that fall under a master service agreement (MSA) or other purchasing cooperative contracts is based on the term length on the individual order form or similar document for the software license and must be for more than one year to be allowable on HEAF. For example, obtaining a quote to submit a requisition for a subscription or licenses under an MSA or purchasing cooperative contract is considered an individual order.
- One-year contracts (or one-year individual order forms related to an MSA or purchasing cooperative contract) that allow for subsequent annual renewals are not allowable, as the original contract (or individual order form related to an MSA or purchasing cooperative contract) period is not more than one year.
- Maintenance/support service line items are allowed if paid as part of the subscription contract or on the original requisition. Stand-alone or renewal support/maintenance service contracts are not allowed.
- Implementation costs can be paid from HEAF if included as part of the original subscription contract or requisition with the same software vendor. Separate contracts for implementation costs with an independent implementation partner should be charged to alternative funds. Procurement Services and Accounting Services will assess allowability of alternative arrangements.
- Subscription contract costs can be paid up-front on an interval (e.g. monthly or annually) not to exceed a one-year period. Procurement Services and Accounting Services will assess allowability of alternative arrangements.
Notes:
- Advanced Payments: are not allowed from HEAF funds.
- HEAF Funds: May not be utilized for operating expenses or to purchase consumable supplies.
Revised 05/2025
Procurement Services
-
Address
Box 41094, TTU Plaza, Suite 408, 1901 University Avenue, Lubbock, TX 79409-1094 -
Phone
806.742.3844 | Fax: 806.742.3820 -
Email
techbuy.purchasing@ttu.edu