Roop, S., Olson, L., Bierling, D., Warner, J., Rinehart, A., Sandoval, A., Beruvides,
M., T. F. Wiesner, "Year Two Report on the Research for the Value of Pipelines to the Transportation
System of Texas," No. 1858-2. For the Texas Department of Transportation, Austin,
Texas (2001).
Icli, B., J. Hegde, T. F. Wiesner, D. James, M. Manderson, M. D'Alise, "A Feasibility Study to Measure Time-Varying
Temperatures around Spinal Instrumentation Using a Bovie Electrocautery Device," For
Depuy/Acromed, Inc. Raynham, MA (2001).
Roop, S., Olson, L., Bierling, D., Sandoval, A., T. F. Wiesner, "Year One Report on the Research for the Value of Pipelines to the Transportation
System of Texas," No. 1858-1. For the Texas Department of Transportation, Austin,
Texas (2000).
A. Sacco Jr., Contract DAAK11-82-C-0043, Annual Report "Method For Determining Catalytic Activity
of ASC Whetlerite Carbon Beds," (with J. Hammarstrom) CRDC-CR-8400 (1983).
A. Sacco Jr., Contract DAAK11-80-CO-0103, Final Report "Residual Life Method for Determining Gas
Protection of ASC Whetlerite Carbon Beds," (with J. Hammarstrom and N. Bac) (1982).
A. Sacco Jr., Contract DAAK11-80-CO-0103, Quarterly Progress Report No. 4 "Residual Method for
Determining Gas Protection of ASC Whetlerite Carbon Beds," (with J. Hammarstrom and
N. Bac) CSL#ARCSL-CR-81081 (1981).
A. Sacco Jr., Contract DAAK11-80-CO-0103, Quarterly Progress Report No. 3 "Residual Life Method
for Determining Gas Protection of ASC Whetlerite Carbon Beds," (with J. Hammarstrom
and N. Bac) CSL#ARCSL-CR-81080 (1981).
A. Sacco Jr., Contract DAAK11-80-CO-0103, Quarterly Progress Report No. 2 "Residual Life Method
for Determining Gas Protection of ASC Whetlerite Carbon Beds," (with J. Hammarstrom
and N. Bac) CSL#ARCSL-CR-81079 (1981).
A. Sacco Jr., Contract DAAK11-80-CO-0103, Quarterly Progress Report No. 1 "Residual Life Method
for Determining Gas Protection of ASC Whetlerite Carbon Beds," (with J. Hammarstrom
and N. Bac) CSL#ARCSL-CR-81078 (1980).
A. Sacco Jr., Contract DAAK11-79-0016, Final Report "Hydrocarbon Pulse Testing for Collective
Protective Filters," (with B. Chung) (1980).
A. Sacco Jr., Contract DAAK11-79-0016, Quarterly Progress Report No. 5 "Hydrocarbon Pulse Testing
for Collective Protective Filters," (with B. Chung and A. Paravar) (1980).
A. Sacco Jr., Contract DAAA15-76-0072, Final Report "Residual Protective Life of Carbon Beds,"
(with A. H. Weiss and Y. Aksoy) (1979).
A. Sacco Jr., Contract DAAK11-79-0016, Quarterly Progress Report No. 4 "Hydrocarbon Pulse Testing
for Collective Protective Filters," (with B. Chung, A. Paravar, and H. Chi) CSL#ARCSL-CR-80035
(1979).
A. Sacco Jr., Contract DAAA15-76-0072, Quarterly Progress Report No. 13 "Residual Protective Life
of Carbon Beds," (with Y. Aksoy). CSL#ARCSL-CR-80061 (1979).
A. Sacco Jr., Contract DAAK11-79-0016, Quarterly Progress Report No. 3 "Hydrocarbon Pulse Testing
for Collective Protective Filters," (with B. Chung, A. Paravar, and A. Weiss) (1979).
A. Sacco Jr., Contract DAAK11-79-0016, Quarterly Progress Report No. 2 "Hydrocarbon Pulse Testing
for Collective Protective Filters," (with B. Chung and A. Weiss) CSL#ARCSL-CR-80012
(1979).
A. Sacco Jr., Contract DAAA15-76-0072, Quarterly Progress Report No. 12 "Residual Protective Life
of Carbon Beds," (with W. F. Kladnig, A. H. Weiss, and Y. Aksoy) CSL#ARCSL-CR-80023
(1979).
A. Sacco Jr., Contract DAAK11-79-0016, Quarterly Progress Report No. 1 "Hydrocarbon Pulse Testing
for Collective Protective Filters," (with B. Chung and A. Weiss) CSL#ARCSL-CR-80011
(1979).
A. Sacco Jr., Contract DAAA15-76-0072, Quarterly Progress Report No. 11 "Residual Protective Life
of Carbon Beds," (with W. F. Kladnig, A. H. Weiss, B. Chung, and Y. Aksoy) CSL#ARCSL-CR-80022
(1979).
A. Sacco Jr., Contract DAAA15-76-0072, Quarterly Progress Report No. 10 "Residual Protective Life
of Carbon Beds," (with A. Olcay, Y. Aksoy, and A. H. Weiss) CSL#ARCSL-CR-80021 (1978).